Communications Site, Beddington Lane, Croydon (CR0 4TH)
HM Land Registry title SGL778705 · Leasehold · CR0 4TH
SUTTON, GREATER LONDON, GREATER LONDON
Who owns it
Proprietorship: Limited Company or Public Limited Company.
Planning at this postcode
- Conversion of loft space involving alterations to existing roofline, two dormer extensions at rear and rooflights to front roofslope.
Application Granted, 2026-05-22 · London Borough of Sutton · DM2026/00410 - Conversion of loft space involving alterations to existing roofline, a dormer extension at rear and rooflights to front roofslope.
Application Granted, 2026-03-11 · London Borough of Sutton · DM2026/00059 - Erection of a part one, part two storey rear extension.
Application Granted, 2026-03-06 · London Borough of Sutton · DM2026/00017 - Non material amendment to approved application D2012/66220 (as amended by Non-Material Amendment Ref: D2016/74707, DM2018/00299, DM2018/00190, DM2018/00334, DM2021/01695). DM2025/00613) which allowed the 'Phased demolition of existing buildings and development of an energy recovery facility (ERF) and buildings ancillary to the ERF, construction of two combined heat and power (CHP) pipelines, revisions to the approved restoration plan for the Beddington landfill site, amendments to the existing in-vessel composting operations, removal of existing access and provision of new access road and reconfiguration of access to Thames Water site to north,' to amend condition 3 (approved drawings) relating to pipe routing.
Application Granted, 2026-02-02 · London Borough of Sutton · DM2025/01597 - Non material amendment to approved application D2012/66220/FUL (as amended by Non-Material Amendments refs: D2016/74707, DM2018/00299, DM2018/00190, DM2018/00334, DM2021/01695) which allowed the 'Phased demolition of existing buildings and development of an energy recovery facility (ERF) and buildings ancillary to the ERF, construction of two combined heat and power (CHP) pipelines, revisions to the approved restoration plan for the Beddington landfill site, amendments to the existing in-vessel composting operations, removal of existing access and provision of new access road and reconfiguration of access to Thames Water site to north.' to amend the CHP pipe routing and provision of ancillary pipeline and structures including height restriction barriers.
Application Granted, 2025-06-11 · London Borough of Sutton · DM2025/00613 - Erection of a single storey front extension.
Application Granted, 2025-05-19 · London Borough of Sutton · DM2025/00370 - EIA Screening request
Response Issued, 2023-08-25 · London Borough of Sutton · EIA2023/00003 - Replacement of 6no. antennas and ancillary works thereto. (EJ/CTIL_137523 25)
Non-Determination, 2022-06-27 · London Borough of Sutton · DM2022/01116 - Non material amendment to approved application D2012/66220 which allowed the 'Phased demolition of existing buildings and development of an energy recovery facility (ERF) and buildings ancillary to the ERF, construction of two combined heat and power (CHP) pipelines, revisions to the approved restoration plan for the Beddington landfill site, amendments to the existing in-vessel composting operations, removal of existing access and provision of new access road and reconfiguration of access to Thames Water site to north.' to provide alterations to handrails, cladding finish, roof, fenestration, parapet wall, fence line and balcony.
Application Granted, 2022-06-22 · London Borough of Sutton · DM2021/01695 - Application to clear condition 19 (Boundary treatment) of approved application D2012/66220.
Response Issued, 2022-06-13 · London Borough of Sutton · CLC2021/00205
Local planning authority records. Applications at the postcode, which may cover neighbouring addresses.
This is the corporate ownership of the title as HM Land Registry records it. The full register entry, including any charges, is at HM Land Registry.